Will the new asset fit, and can you even get it there?
Steel | Install feasibility
Check the fit before a dollar is committed.
The new equipment is bought before anyone proves it fits. Clearances get checked with a tape measure and hope. The interference shows up on install day, with the crane rigged and the crew on the clock.
Need help?
Call us to speak with one of our experts
How the Visual Twin solves it
Test the install against reality, not the drawing.
Drop the vendor model of the new asset into your Visual Twin and test the fit against reality: every clearance, every anchor, every path from the door to the foundation. We can even stage the mobile equipment, from forklifts to Brodys, to prove the move works.
The workflow in practice
- Import the vendor STP model into your Visual Twin
- Check clearances against as-is conditions, down to the inch
- Walk the rigging path virtually and stage the lift
- Sign off on the install before a dollar is committed
Proof it pays
The shutdown that got two days back.
Within about an hour of scanning, the Visual Twin showed a steel producer that their planned approach was not going to work. Spartan helped validate a new plan before a single contractor mobilized. Eighteen contractor crews worked from one model and the outage finished two days early, worth roughly $2 million in restored production. Download the one-page case study or run your own numbers in the downtime calculator.